BELOW THE WATERLINE
PHASE 3 · IN BUILDBelow the waterline
For partners and venue operators who care about the spec sheet.
Everything above this line is the show. This is what holds it up — topology, gear, and field notes from the problems that took a night and a half to isolate.
It’s written for two people: the venue operator weighing a permanent install, and the engineer who wants to know whether we know what we’re doing before picking up the phone. Both of them deserve the drawings, not a pitch.
Signal-flow diagrams, the full stack inventory, and the write-ups are being assembled now — dated, versioned, and honest about what’s ours and what’s rented.
Interactive node-edge diagrams. Audio, video and control, filterable by event type.
Consoles, networking topology, fixture counts. Dated and versioned.
Write-ups on real problems solved, with the isolation path intact.
If you came this deep, this room is for you. Ask and we’ll send the drawings early.
Request the drawings