BELOW THE WATERLINE

PHASE 3 · IN BUILD

Below the waterline

For partners and venue operators who care about the spec sheet.

Everything above this line is the show. This is what holds it up — topology, gear, and field notes from the problems that took a night and a half to isolate.

It’s written for two people: the venue operator weighing a permanent install, and the engineer who wants to know whether we know what we’re doing before picking up the phone. Both of them deserve the drawings, not a pitch.

Signal-flow diagrams, the full stack inventory, and the write-ups are being assembled now — dated, versioned, and honest about what’s ours and what’s rented.

Signal-flow libraryQUEUED

Interactive node-edge diagrams. Audio, video and control, filterable by event type.

Stack inventoryQUEUED

Consoles, networking topology, fixture counts. Dated and versioned.

Field notesQUEUED

Write-ups on real problems solved, with the isolation path intact.

If you came this deep, this room is for you. Ask and we’ll send the drawings early.

Request the drawings
Your mic moves the ocean and nothing else. It’s analyzed on this device and never played back, recorded or sent anywhere.